Bottom stringers being installed.
|

|
Steel forward bulkhead being prepared for fitting. Round bar is being welded around the opening to soften the edges.
|

|
Forward bulkhead being fitted. The upper panels are pulled in with a sash clamp for a good fit.
|

|
Hull floors being fitted and checked for alignment with a centreline plumb line.
|

|
Tank components starting to go in.
|

|
Tanks assembled.
|

|
This photo shows the perfect fit of the components. Owner builder, Peter Weston, says:-
"If you want to use any of these photos please do, I think they show the finite fitment of parts that is achieved when using a kit, we would never achieve this accuracy in a hundred years if cutting ourselves, let alone the time factor."
|
|
|