Skin panels and stringers arrive from the steel supply company on a pallet.
|

|
Smaller components arrive on a separate pallet.
|

|
Panels of hull and deck skin laid out for checking.
|

|
Components of integral tanks to be built in hull bottom over keel.
|

|
Components of intermediate keel floors.
|

|
Steel rails levelled and bolted to slab, forming solid base off which to work. First of 3 external frames that form the building cradle being moved into position.
The cradle is fabricated by the builder to plans supplied with the kit.
|

|
Cradle set up and braced, ready for keel construction to start.
|