Page 5 - Deck construction
Back to Builders' Notes
|
The foredeck has already been built. The deck stringers have also been fitted.
|
|
Deck stringers are slotted through the T-shape deck beams.
|
|
Same stage, looking aft. In centre foreground you can see the top of the mast compression post, with the deck beam and stringer passing through it.
|
|
Cockpit seats and well constructed. The lockers have been framed and the bottoms installed.
|
|
Cockpit coamings completed.
|
|
Foredeck with slot cut for bowsprit, ready for section of PVC or similar half pipe to be fitted and glassed in place.
|
|
MENU
Home
Overview
Email
Designs
Materials
Articles
Testimonials
Bookstore
Magazines
PRICES
Global
RSA
ORDERS
Fax/Mail
Credit Card
LINKS
Boat Sites
Communities
General
TRANSLATE
|